technical report

2026 under pressure

The public incidents of 2026 left a repeated signal: a concentrated dependency, an unrehearsed recovery or late communication can carry the impact far beyond the system that failed. This 26-page report gathers and analyses public incidents from Uruguay and the world between 1 January and 26 November 2026. It is not a ranking of headlines: it identifies dependencies, duration, available evidence and the continuity decisions worth reviewing before 2027.

Pages
26
Format
PDF
Language
Español
Cost
Free

What it covers

  • The auditable base: 24 canonical incidents (9 from Uruguay, 15 international) and 7 exploitation signals, kept in separate universes that are never blended into manufactured figures.
  • Methodology, sample and limits: inclusion criteria frozen before calculating percentages, and which data do not allow direct comparison.
  • Uruguay: the year’s material events, with their evidence, duration and what was not published.
  • International picture: cloud, SaaS, aviation, energy, telecommunications and supply chain.
  • Vulnerabilities that reached operations: confirmed exploitation and KEV, kept apart from exposures without a confirmed campaign.
  • Cross-cutting patterns: concentration, third parties, changes, recovery and communication.
  • Five decisions for 2027 and a ten-question continuity self-assessment.

Who it is for

  • Boards that must approve 2027 priorities and want evidence instead of headlines.
  • Technology, security, risk and continuity leads managing third-party dependencies.
  • Organisations whose operation depends on cloud, SaaS, connectivity or concentrated suppliers.